feat: restore final CHOAM Mentat after Semuta Gamont reactions
This commit is contained in:
1 parent
c468dc9e44
commit
12e4bcbf45
7 files changed
+145
-7
No files matched your search
@@ -1,5 +1,35 @@
|
||||
# Dune implementation status
|
||||
|
||||
## 11 October 2026 — original final Mentat after Semuta/Gamont
|
||||
|
||||
The Gamont receipt now carries an optional final-Mentat marker and signs the
|
||||
native pending opportunity. After the selected physical return, claim/pass
|
||||
restores the same `choamMentat` decision for CHOAM. No victory check or phase
|
||||
advance runs inside the receipt; the original owner must still finish.
|
||||
Unmarked proactive signatures remain unchanged.
|
||||
|
||||
The regression fails before and passes after. Actual native market, readiness
|
||||
and done actions create the closing window. Its unopposed board gives Atreides
|
||||
a three-stronghold victory; recall removes Arrakeen before the same owner can
|
||||
finish. Claim/pass preserves turn2/Mentat, exact force return and cards;
|
||||
wrong-owner completion and retired reactions reject. CHOAM's actual Done then
|
||||
advances to turn3/Storm with no winner. The fixture initially checked phase
|
||||
before native market completion and placed Tabr in sector13; corrected
|
||||
progression and canonical sector14 required no production rule change.
|
||||
|
||||
Twelve isolated runtime scenarios cover Basic/Advanced, claim/pass and all
|
||||
four legal AI profiles, including each profile finishing the restored owner
|
||||
window. Real production GameTable at 390px performs Return this force, Semuta
|
||||
commitment, the restored Finish and check victory and actual turn3/Storm
|
||||
continuation, without horizontal overflow.
|
||||
Types/lint and 82 affected unit cases across six files pass.
|
||||
|
||||
Temporary scripts, isolated server and browser tab are removed/stopped; no
|
||||
saved store or deployed game was targeted. Nexus and other competing parents
|
||||
remain separate. Full Semuta/CHOAM and deployed acceptance remain open.
|
||||
Contracts: [source/runtime](SEMUTA_SOURCE_UPDATE_20260907.md),
|
||||
[discard suffix](SEMUTA_DISCARD_CONTINUATIONS.md).
|
||||
|
||||
## 11 October 2026 — typed and concealed Gamont with Semuta
|
||||
|
||||
The existing receipt already signs target elite and No-Field custody, but the
|
||||
|
||||
Reference in new issue
Block a user