Resolve Sneak arrivals during Great Maker rides
Verify and publish checkpoint container / container (push) Canceled after 0s
Verify and publish checkpoint container / container (push) Canceled after 0s
This commit is contained in:
1 parent
57321c2c8d
commit
2ad7f127ec
9 files changed
+290
-13
No files matched your search
+12
-1
@@ -17,12 +17,23 @@ open mode gates.
|
||||
|
||||
## Current checkpoint and work
|
||||
|
||||
**Sneak during a Great Maker arrival — 29 October. Prototyped / Partial.**
|
||||
Great Maker now retains its original reserve ride while a positive Moritani
|
||||
Sneak group resolves its own reactions, then completes once. Its encounter and
|
||||
arrival remain bound to the saved worm continuation. Twelve related files pass
|
||||
79 cases, including a real vote and ride, both paired-owner orders and legal
|
||||
bot choices. Fixtures use audit setup and control the turn, token placement,
|
||||
Spice order and paired owner order. Wider optional interactions and deployed
|
||||
verification remain open.
|
||||
[Scope](MORITANI_ENTRY_TIMING.md#great-maker-sneak-arrivals--29-october-2026).
|
||||
|
||||
**Advanced Sneak during a worm ride — 29 October. Prototyped / Partial.**
|
||||
A separate saved continuation retains the Fremen rider while a positive
|
||||
Moritani Sneak group resolves its own arrival and reactions. It resumes the
|
||||
original worm once, including the next ride or a summoned-worm Nexus. Ten
|
||||
related files pass 75 cases, including existing bot choices; the worm fixtures
|
||||
stage their starting positions. Great Maker, wider optional-module combinations,
|
||||
stage their starting positions. The later Great Maker checkpoint above extends
|
||||
that continuation; wider optional-module combinations,
|
||||
full-game and deployed verification remain open.
|
||||
[Scope](MORITANI_ENTRY_TIMING.md#advanced-sneak-on-a-worm-ride--29-october-2026).
|
||||
|
||||
|
||||
@@ -1,5 +1,14 @@
|
||||
# Discovery functional prototype
|
||||
|
||||
## Great Maker and Sneak Attack — 29 October 2026
|
||||
|
||||
**Prototyped / Partial.** Great Maker's signed reserve arrival can wait for a
|
||||
positive Moritani Sneak group and its own arrival reactions before completing.
|
||||
This retains the original Fremen rider and does not spend another movement or
|
||||
shipment. The original paired Ecaz/Moritani entry is also recognized. The
|
||||
provisional ordering, controlled fixture staging and remaining combinations are
|
||||
recorded in [the entry contract](MORITANI_ENTRY_TIMING.md#great-maker-sneak-arrivals--29-october-2026).
|
||||
|
||||
## Sapho at Ecological Testing Station — 29 October 2026
|
||||
|
||||
**Prototyped / Partial.** Before either of two original occupants chooses,
|
||||
|
||||
@@ -2,6 +2,25 @@
|
||||
|
||||
Reviewed 2026-09-06. This supplements `MORITANI_TERROR_RULES.md`; it does not enable combined-faction play or certify an implementation order.
|
||||
|
||||
## Great Maker Sneak arrivals — 29 October 2026
|
||||
|
||||
**Prototyped / Partial.** An Advanced Great Maker reserve arrival now retains
|
||||
its original encounter and ride while a positive Moritani Sneak group resolves
|
||||
its own eligible reactions, then completes the Great Maker once. Its existing
|
||||
encounter signature binds the saved continuation, and the original paired
|
||||
Ambassador/Terror entry is also recognized while its owners act. Zero forces
|
||||
retain the normal original continuation. Ordering is the provisional child
|
||||
composition below, not a publisher priority ruling.
|
||||
|
||||
Twelve related files pass 79 cases. The focused fixture uses audit setup and
|
||||
controls the later turn, physical token placements, unplayed Spice order and
|
||||
paired owner order; actual Great Maker votes and the reserve ride are actions.
|
||||
Tests cover both original owner orders, Bene Gesserit, the child Ambassador,
|
||||
zero and legal bot choices. A summon during a held ordinary Sneak child also
|
||||
retains its Nexus before the next ride. Great Maker with a non-immediate summoned
|
||||
worm and other deeply nested or optional combinations remain open, as do
|
||||
full-game and deployed verification.
|
||||
|
||||
## Advanced Sneak on a worm ride — 29 October 2026
|
||||
|
||||
**Prototyped / Partial.** During an ordinary Advanced worm arrival, a positive
|
||||
@@ -16,9 +35,8 @@ Ten related files pass 75 cases. Staged Advanced worm positions exercise direct
|
||||
and paired parents, both owner orders, BG accompaniment, a Guild Ambassador
|
||||
child, zero, next/final ride and a summoned-worm interruption; existing bot
|
||||
choices remain legal. These are not full-game or deployed acceptance. Great
|
||||
Maker arrivals retain a temporary positive-entry guard because their separate
|
||||
saved arrival witness is not yet connected to this continuation. Other optional
|
||||
module combinations remain unfinished.
|
||||
Maker arrivals are extended by the later checkpoint above. Other optional module
|
||||
combinations remain unfinished.
|
||||
|
||||
## Direct Advanced Sneak arrivals — 29 October 2026
|
||||
|
||||
@@ -32,8 +50,8 @@ publisher priority ruling. Caladan and revival source receipts retain their
|
||||
dedicated paths.
|
||||
|
||||
The later ordinary-worm checkpoint above retains the rider separately from
|
||||
Moritani's child. Great Maker and broader modules remain open; deployed
|
||||
verification remains open.
|
||||
Moritani's child; the later checkpoint above also extends Great Maker. Broader
|
||||
modules and deployed verification remain open.
|
||||
|
||||
Ten related files pass 73 cases. Direct runtime fixtures use genuine Advanced
|
||||
setup and physical token selection/placement under control, including BG and
|
||||
@@ -55,7 +73,7 @@ described in GF9 Ecaz & Moritani rules pp. 8 and 15.
|
||||
|
||||
Fremen destinations combining Advanced fighter Intrusion with Terror retain
|
||||
their existing restriction, and simultaneous Ambassador/Terror on Guild
|
||||
accompaniment remains separate. Other optional modules, Great Maker,
|
||||
accompaniment remains separate. Other optional modules, further Great Maker interactions,
|
||||
complete rules and deployed verification remain open.
|
||||
|
||||
Eight related files pass 52 cases. Real Advanced setup covers both owner orders,
|
||||
|
||||
@@ -1,10 +1,17 @@
|
||||
# Rule decision index
|
||||
|
||||
## Great Maker Sneak arrival — 29 October 2026
|
||||
|
||||
Great Maker retains its signed reserve arrival while the separately committed
|
||||
Sneak group finishes its reactions, then continues once. The owner/child order
|
||||
is provisional; deeper optional interactions remain open.
|
||||
[Scope](MORITANI_ENTRY_TIMING.md#great-maker-sneak-arrivals--29-october-2026).
|
||||
|
||||
## Advanced Sneak on a worm ride — 29 October 2026
|
||||
|
||||
An ordinary worm rider's continuation waits for the separately committed Sneak
|
||||
group and its reactions; the child does not inherit the Fremen rider's identity.
|
||||
The ordering is provisional. Great Maker retains its separate guard.
|
||||
The ordering is provisional. The later Great Maker checkpoint above extends it.
|
||||
[Scope](MORITANI_ENTRY_TIMING.md#advanced-sneak-on-a-worm-ride--29-october-2026).
|
||||
|
||||
## Direct Advanced Sneak arrival — 29 October 2026
|
||||
|
||||
Reference in new issue
Block a user