Plan ordinary promises across one native Charity claim
This commit is contained in:
1 parent
b81823bbec
commit
38738eabac
15 files changed
+831
-96
No files matched your search
@@ -20,6 +20,34 @@ open mode gates.
|
||||
Continue remaining Basic functions before Advanced and wider interactions.
|
||||
Prototype labels and final acceptance gates remain.
|
||||
|
||||
**Truthtrance / Charity-funded installments — 27 October. Prototyped / Partial.**
|
||||
One remaining owned claim can fund payments after actual prepayments. Whole,
|
||||
bare, grouped and mixed questions share that timeline, cumulative caps and the
|
||||
final purse. Current card windows retain their order before future Charity.
|
||||
Actual phase-2 guides claim once; positive acceptance retains own readiness.
|
||||
A premature claim cannot evade a promised payment.
|
||||
|
||||
Frozen **24 files, 349/349**, types/lint/build and seven native journeys
|
||||
pass, including existing early-movement regressions. Journeys include 55
|
||||
GameTable SSR renders, 7 actual answer callbacks and 26 exact guide callbacks
|
||||
(23 whole, 3 scalar). Genuine selected-Ix sources use 14 original opening
|
||||
actions, 18 after real Amal/closure, or 17 before printed Thumper; inventories and
|
||||
all source/further-action counts derive from native arrays.
|
||||
|
||||
Actual paths prove Amal cash 5 then pay 5/Charity 2/pay 1, Thumper before its future
|
||||
claim, separate recipient 3+3 installments, one claim shared with shipment, and
|
||||
manual pay 4→cash 1: claiming early would strand owed 3 and rejects; pay 1/claim 2/pay 2
|
||||
fulfills 7. Claimed/expired income and two-Truth overbooking reject; No caps and
|
||||
history remain. A narrow fixture question annotation and unused import are
|
||||
corrected during feedback. No strategic AI or comprehensive assurance runs.
|
||||
|
||||
Proof: `/home/quintine/.local/share/dune/checkpoints/20261027-truth-charity-proof-v3/`;
|
||||
journeys/HTML: adjacent `20261027-truth-charity-runtime/run-v3/`.
|
||||
No HTTP/storage boundary, saved-game/database, restart or deployed operation
|
||||
changes. Unresolved CHOAM own-opening income, other future income, broader deals/
|
||||
optional combinations, full modes and final acceptance remain open.
|
||||
[Contract](TRUTHTRANCE_TURN_ACTIONS.md#charity-funded-installments--27-october-2026).
|
||||
|
||||
**Truthtrance / phase-opening Amal — 27 October. Prototyped / Partial.**
|
||||
Supported original openings now admit whole questions and actual printed Amal
|
||||
conditions. Native halving precedes ordinary payments. Definite answers reopen
|
||||
|
||||
@@ -1,5 +1,17 @@
|
||||
# Dune implementation status
|
||||
|
||||
## 27 October 2026 — Charity-funded payment installments
|
||||
|
||||
Prototyped / Partial. Bare and combined payments can use one owned remaining
|
||||
Charity claim after actual prepayments, preserving current card windows and the
|
||||
same final purse for movement/Revival. Current-phase guides, readiness, cumulative
|
||||
caps and bad-order rejection are connected. Frozen 24 files, 349/349, types/
|
||||
lint/build and seven journeys (55 SSR renders, 7 answers, 26 guides) pass,
|
||||
including existing early-movement cases. No strategic tuning, deployment or saved-
|
||||
game operation occurs. Wider income/deals and complete acceptance remain.
|
||||
[Contract](TRUTHTRANCE_TURN_ACTIONS.md#charity-funded-installments--27-october-2026).
|
||||
Private proof: `/home/quintine/.local/share/dune/checkpoints/20261027-truth-charity-proof-v3/`.
|
||||
|
||||
## 27 October 2026 — Phase-opening Amal commitments
|
||||
|
||||
Prototyped / Partial. Original opening questions, actual printed Amal costs,
|
||||
|
||||
@@ -1,5 +1,19 @@
|
||||
# Rule decision index
|
||||
|
||||
## Truthtrance Charity-funded installments — 27 October 2026
|
||||
|
||||
Prototyped / Partial. Extend ordinary payment witnesses with one remaining owned
|
||||
Charity claim under its native wealth, phase, token and once-per-turn rules.
|
||||
Real prepayments may reduce wealth before the claim; the later installment
|
||||
still counts only when actually paid. Keep current card/Nexus windows before
|
||||
future Charity and share the resulting purse with every other commitment.
|
||||
Own premature claiming or passing cannot evade an answer. Recipient receipts
|
||||
remain deferred. This is bounded composition of existing Charity/bribery and
|
||||
Truthtrance authority, without inventing future auction/collection income,
|
||||
foreign gifts or a selected public route. Unresolved CHOAM own-opening income
|
||||
and wider optional combinations retain their separate boundaries.
|
||||
[Contract](TRUTHTRANCE_TURN_ACTIONS.md#charity-funded-installments--27-october-2026).
|
||||
|
||||
## Truthtrance printed Amal and phase openings — 27 October 2026
|
||||
|
||||
Prototyped / Partial. Extend the existing whole current-turn answer composition
|
||||
|
||||
@@ -1,5 +1,12 @@
|
||||
# Truthtrance ordinary bribe-payment promises
|
||||
|
||||
**27 October Charity follow-up:** an owned remaining ordinary claim can follow
|
||||
actual prepayments and fund a later installment, with current-phase guides for
|
||||
both actions. Positive answers reopen Charity readiness, and own passing or an
|
||||
underfunding early claim cannot evade the answer. This supersedes only the
|
||||
ordinary-Charity exclusion below. Other future income/preparations remain
|
||||
bounded. [Current contract](TRUTHTRANCE_TURN_ACTIONS.md#charity-funded-installments--27-october-2026).
|
||||
|
||||
**26 October timing follow-up:** [Mentat bribes](MENTAT_BRIBES.md) extend the
|
||||
current-turn window through phase8. Yes must finish before Mentat Ready; No
|
||||
remains live across opening collection until the actual next turn. Late receipts
|
||||
|
||||
@@ -1,5 +1,48 @@
|
||||
# Truthtrance combined current-turn actions
|
||||
|
||||
## Charity-funded installments — 27 October 2026
|
||||
|
||||
**Prototyped / Partial.** Ordinary payment witnesses can now schedule one
|
||||
remaining owned Charity claim and the actual installments around it. After
|
||||
printed Amal reduces cash 10 to 5, a real payment of 5 can precede the normal
|
||||
two-spice claim; a later payment of 1 completes 6. Different recipients share
|
||||
the same cash and claim. Charity itself never counts as a bribe, and actual
|
||||
recipient receipts remain deferred to their original Mentat opening.
|
||||
|
||||
The shared private planner partitions exact deficits, validates native Charity
|
||||
and stamps the hypothetical claim once. The same helper serves existing
|
||||
movement/Revival preparation. The final purse funds every later obligation:
|
||||
after Amal, payment 6 plus a two-spice desert shipment is unfunded; payment 5
|
||||
plus that shipment can use the single claim. An early claim at cash 1 cannot
|
||||
strand a previously accepted seven-spice payment: pay the remaining 1 first,
|
||||
then claim 2 and pay the remaining 2. Actual rejected actions stay immutable.
|
||||
|
||||
Current printed windows precede future Charity. A required Thumper spends its
|
||||
physical cost before the later claim; quotes do not consume hidden normal
|
||||
Spice cards or turn future money into current cash. Native card preparations
|
||||
can precede payments where their effect/order requires it. Any original Nexus
|
||||
agreement must fit before the future phase and retain recipient restrictions.
|
||||
No chosen branch, timeline or prospective income is installed in a real game.
|
||||
|
||||
Bare, grouped, mixed and combined payment questions use guarded current-phase
|
||||
payment/Charity packets. Positive acceptance reopens owned Charity readiness;
|
||||
own Ready cannot forfeit the necessary claim. After an actual claim or phase
|
||||
expiry it cannot be reserved again. Cumulative No caps and original history
|
||||
persist. Four profiles consume legal guides; strategy and calibration remain
|
||||
deferred. Native phase controls handle waiting before the actual Charity phase.
|
||||
|
||||
Other future income, unresolved CHOAM own-opening income, wider card/optional
|
||||
compositions, complete modes and final assurance remain open. Existing native
|
||||
ordinary entitlement for another faction is quoted without choosing CHOAM's
|
||||
foreign opening response. This is a bounded extension, not full planning of all
|
||||
possible deals or later collection.
|
||||
Frozen evidence: 24 affected files, 349/349, types/lint/build and seven
|
||||
native/SSR/control journeys pass (55 GameTable renders, 7 answer callbacks,
|
||||
23 whole and 3 scalar guide callbacks). Private proof:
|
||||
`/home/quintine/.local/share/dune/checkpoints/20261027-truth-charity-proof-v3/`;
|
||||
journeys/HTML: adjacent `20261027-truth-charity-runtime/run-v3/`.
|
||||
This is local native/SSR evidence, not browser hydration or deployed acceptance.
|
||||
|
||||
## Printed Amal and phase openings — 27 October 2026
|
||||
|
||||
**Prototyped / Partial.** Whole questions can now be asked during a supported
|
||||
|
||||
Reference in new issue
Block a user