Plan ordinary promises across one native Charity claim
This commit is contained in:
1 parent
b81823bbec
commit
38738eabac
15 files changed
+831
-96
No files matched your search
@@ -1,5 +1,48 @@
|
||||
# Truthtrance combined current-turn actions
|
||||
|
||||
## Charity-funded installments — 27 October 2026
|
||||
|
||||
**Prototyped / Partial.** Ordinary payment witnesses can now schedule one
|
||||
remaining owned Charity claim and the actual installments around it. After
|
||||
printed Amal reduces cash 10 to 5, a real payment of 5 can precede the normal
|
||||
two-spice claim; a later payment of 1 completes 6. Different recipients share
|
||||
the same cash and claim. Charity itself never counts as a bribe, and actual
|
||||
recipient receipts remain deferred to their original Mentat opening.
|
||||
|
||||
The shared private planner partitions exact deficits, validates native Charity
|
||||
and stamps the hypothetical claim once. The same helper serves existing
|
||||
movement/Revival preparation. The final purse funds every later obligation:
|
||||
after Amal, payment 6 plus a two-spice desert shipment is unfunded; payment 5
|
||||
plus that shipment can use the single claim. An early claim at cash 1 cannot
|
||||
strand a previously accepted seven-spice payment: pay the remaining 1 first,
|
||||
then claim 2 and pay the remaining 2. Actual rejected actions stay immutable.
|
||||
|
||||
Current printed windows precede future Charity. A required Thumper spends its
|
||||
physical cost before the later claim; quotes do not consume hidden normal
|
||||
Spice cards or turn future money into current cash. Native card preparations
|
||||
can precede payments where their effect/order requires it. Any original Nexus
|
||||
agreement must fit before the future phase and retain recipient restrictions.
|
||||
No chosen branch, timeline or prospective income is installed in a real game.
|
||||
|
||||
Bare, grouped, mixed and combined payment questions use guarded current-phase
|
||||
payment/Charity packets. Positive acceptance reopens owned Charity readiness;
|
||||
own Ready cannot forfeit the necessary claim. After an actual claim or phase
|
||||
expiry it cannot be reserved again. Cumulative No caps and original history
|
||||
persist. Four profiles consume legal guides; strategy and calibration remain
|
||||
deferred. Native phase controls handle waiting before the actual Charity phase.
|
||||
|
||||
Other future income, unresolved CHOAM own-opening income, wider card/optional
|
||||
compositions, complete modes and final assurance remain open. Existing native
|
||||
ordinary entitlement for another faction is quoted without choosing CHOAM's
|
||||
foreign opening response. This is a bounded extension, not full planning of all
|
||||
possible deals or later collection.
|
||||
Frozen evidence: 24 affected files, 349/349, types/lint/build and seven
|
||||
native/SSR/control journeys pass (55 GameTable renders, 7 answer callbacks,
|
||||
23 whole and 3 scalar guide callbacks). Private proof:
|
||||
`/home/quintine/.local/share/dune/checkpoints/20261027-truth-charity-proof-v3/`;
|
||||
journeys/HTML: adjacent `20261027-truth-charity-runtime/run-v3/`.
|
||||
This is local native/SSR evidence, not browser hydration or deployed acceptance.
|
||||
|
||||
## Printed Amal and phase openings — 27 October 2026
|
||||
|
||||
**Prototyped / Partial.** Whole questions can now be asked during a supported
|
||||
|
||||
Reference in new issue
Block a user