Bind printed transfer and order plays to Truthtrance

This commit is contained in:
Quintine committed 2026-10-27 08:00:08 +11:00
1 parent 3e959504ef
commit 4c4bebe85e
25 files changed
+1245 -57

No files matched your search

+30
View File
@@ -20,6 +20,36 @@ open mode gates.
Continue remaining Basic functions before Advanced and wider interactions.
Prototype labels and final acceptance gates remain.
**Truthtrance / printed transfer and order cards — 27 October. Prototyped / Partial.**
Actual Distrans and Sapho use can be promised without fixing a transfer or order
choice. Costs, current native options, whole AND/OR/No, original turn-end caps,
frozen facts, exact human guides and four legal profiles connect. Upcoming
Movement uses public order/counters without new income. A real ordinary-auction
Semuta claim retains the original lot and standing bid.
Frozen 25 affected test files pass **410/410**, with types/lint/build and
six journey groups/eight original-source programmes. Runtime includes 39
GameTable SSR renders, 8 answer callbacks, 7 whole-guide callbacks,
1 native Sapho callback and 2 real Semuta commit callbacks. Actual cache
purchases, unopened Truth deals, budgets, current turns and inventories remain.
Source/continuation counts derive from arrays; no played state is installed.
Focused feedback finds the unfinished ordinary-auction discard fence and a
fixture that expected an already-last Guild-TAKE tail to move last again. The
native Semuta continuation is connected; older prebid/late-battle drivers now
finish the real discard before continuing. Current legal roles take guide
priority over deferral, and immediate No blocks native controls/policy fallback.
The Sapho no-op rule is preserved.
Real early Revival/pay9/Movement uses Sapho free after cash reaches zero.
A separate actual turn2 Box recovery does not itself count as Distrans replay.
Proof: `/home/quintine/.local/share/dune/checkpoints/20261027-truth-transfer-order-proof-v3/`;
journeys/HTML: adjacent `20261027-truth-transfer-order-runtime/run/`.
No HTTP/storage boundary, saved-game/database, restart or deployed operation
changes. Future Semuta promises, other future calendars/funding, combinations,
complete modes and final assurance/browser/deployed acceptance remain open.
[Contract](TRUTHTRANCE_TURN_ACTIONS.md#printed-transfer-and-order-cards--27-october-2026).
**Truthtrance / printed Nullentropy Box — 27 October. Prototyped / Partial.**
Whole questions can name actual printed activation after answering. The accepted
two-spice fee records use before private selection; the selected card is outside