Keep Atreides special inspection available until plan reveal

Allow native Advanced use after declining the first offer, including a sealed
target. Reuse projected card/target permission in persistent controls and
minimal bots; retain sealed plans and finish target-last public reveal once.

Source: authorized supplied physical27 F. Ordinary preparation priority and
target-first ordering remain provisional; no new reading acknowledgement.

Verified: 11 affected offline files126/126, types/lint, production build, five
actual control/gameplay/GameTable SSR journeys and eight legal profile paths.
No saved-room, D1, reset, restart or deployment operation.
This commit is contained in:
Quintine committed 2026-10-24 18:49:22 +11:00
1 parent 660b0a0c25
commit 61828150b9
15 files changed
+917 -70

No files matched your search

+20
View File
@@ -16,6 +16,26 @@ open mode gates.
## Current checkpoint and work
**Atreides special inspection before reveal — 24 October. Prototyped / Partial.**
Supplied physical27 F now controls the native special Karama deadline. Declining
the original offer preserves quiet later use with zero or one sealed plans.
A sealed target is privately readable immediately; an unsealed target commits
next. Existing plans cannot change, and a target that seals last reaches the
original public reveal without a reading acknowledgement or deadlock.
Persistent controls and minimal bots share spendable-card/target permission.
Ordinary preparation priority and target-first sequencing remain provisional.
[Source, continuation and bounded proof](ATREIDES_FULL_PLAN_TIMING.md#before-reveal-window--24-october-2026).
Disjoint fixture/control lanes and bounded source/continuation review pass
**11 files126/126**, types/lint/build, five actual control/gameplay/GameTable SSR
journeys into Collection and eight existing-profile paths accepting eight
inspection proposals. Genuine49/50-action public Advanced setup, a paid Shield
auction, two paid shipments and actual ground movement supply the battle.
Feedback removes an unintended new pre-leader restriction and repairs reference
metadata/two test type assertions. Full modes, wider combinations, comprehensive/
browser/deployed acceptance and AI refinement remain unfinished. No saved-room,
D1, reset, restart or deployment operation.
**Native advisor preparation — 24 October. Prototyped / Partial.**
Advanced Bene Gesserit can now declare preparation at quiet boundaries in
Charity, Bidding, Revival and before the first actual shipment, including after