Keep Atreides special inspection available until plan reveal
Allow native Advanced use after declining the first offer, including a sealed target. Reuse projected card/target permission in persistent controls and minimal bots; retain sealed plans and finish target-last public reveal once. Source: authorized supplied physical27 F. Ordinary preparation priority and target-first ordering remain provisional; no new reading acknowledgement. Verified: 11 affected offline files126/126, types/lint, production build, five actual control/gameplay/GameTable SSR journeys and eight legal profile paths. No saved-room, D1, reset, restart or deployment operation.
This commit is contained in:
1 parent
660b0a0c25
commit
61828150b9
15 files changed
+917
-70
No files matched your search
@@ -1,5 +1,35 @@
|
||||
# Dune implementation status
|
||||
|
||||
## 24 October 2026 — Atreides special inspection until public reveal
|
||||
|
||||
Use supplied physical27 F's before-reveal deadline after declining the original
|
||||
special offer, including one committed plan. A focused public-state timing quote
|
||||
serves preflight and owner-only card/target projection; persistent controls and
|
||||
minimal existing-profile preference reuse it. A sealed target is read at once;
|
||||
an unsealed one retains target-first commitment. Existing plans, physical pieces,
|
||||
support costs and binding fields stay fixed. Removing the target-branch early
|
||||
return lets the second seal reach normal public reveal once, without a new
|
||||
reading acknowledgement. Preparation priority and sequencing remain provisional.
|
||||
|
||||
Disjoint fixture/control lanes and bounded review pass11 files126/126,
|
||||
types/lint/build, five actual control/gameplay/GameTable SSR journeys through
|
||||
Collection and eight profile paths accepting eight proposals. Genuine49/50
|
||||
public native Advanced actions include an actual one-spice Shield auction,
|
||||
two four-spice shipments and real Arrakeen ground movement. No played phase,
|
||||
army, wallet, hand or plan is assigned. Core and existing No-Field tests now
|
||||
retain late permission rather than the obsolete first-offer deadline; an
|
||||
unrelated owner's late read retains private entitlement.
|
||||
|
||||
Feedback catches and removes an unintended shared pre-leader prerequisite absent
|
||||
from original special preflight, retaining its separate gate on every plan seal.
|
||||
Exact repaired Semuta/Atreides1/1 passes; later type feedback repairs existing
|
||||
reference metadata usage and two test assertions. Final source is frozen through
|
||||
all checks. Full modes, wider optional combinations, comprehensive/browser/
|
||||
deployed assurance and AI refinement remain unfinished. No saved-room/D1/reset/
|
||||
restart/deployment operation.
|
||||
[Source, exact proof and limits](ATREIDES_FULL_PLAN_TIMING.md#before-reveal-window--24-october-2026).
|
||||
Private proof:20261024-atreides-full-plan-window/frozen-integrated-3.
|
||||
|
||||
## 24 October 2026 — Native advisor preparation before first shipment
|
||||
|
||||
Expose the supplied Advanced BG after-Spice/Nexus window in phases2–5 at quiet
|
||||
|
||||
Reference in new issue
Block a user