Allow group admission with compatible commitments
Verify and publish checkpoint container / container (push) Canceled after 0s
Verify and publish checkpoint container / container (push) Canceled after 0s
This commit is contained in:
1 parent
0faa7923b0
commit
6524ed3bf2
14 files changed
+679
-53
No files matched your search
+18
-6
@@ -17,11 +17,23 @@ open mode gates.
|
||||
|
||||
## Current checkpoint and work
|
||||
|
||||
**Staged group admission with live commitments — 29 October. Prototyped / Partial.**
|
||||
Each proposer and accepting member is checked against their own bribe and
|
||||
alliance answers; unrelated participants can still negotiate and bots decline
|
||||
blocked consent. Pending invitations preserve alliance answers. Admission is
|
||||
fenced when the older whole-turn planner could misread combined alliance and
|
||||
payment/travel answers as a pair-only state. Fourteen related files pass 82
|
||||
cases, and the joint-planner regression passes separately. Typecheck, lint and
|
||||
the production build pass. Group funding with
|
||||
member commitments, whole-turn Nexus changes, other profiles and lobby entry
|
||||
remain unfinished. [Scope](OPTIONAL_ALLIANCE_VICTORY.md#group-admission-with-live-commitments--29-october-2026).
|
||||
|
||||
**Staged group departures and unrelated commitments — 29 October. Prototyped / Partial.**
|
||||
Group members can leave while bribe answers remain binding; invitations stay
|
||||
blocked until those commitments resolve. Group funding remains available when
|
||||
Group members can leave while bribe answers remain binding; invitations were
|
||||
initially blocked until those commitments resolved (see the later prototype
|
||||
above). Group funding remains available when
|
||||
only nonmembers have unfinished commitments, while member commitments still
|
||||
fence it. Whole-turn Nexus changes, live-bribe admission and member-commitment
|
||||
fence it. Whole-turn Nexus changes and member-commitment
|
||||
funding remain unfinished. Twelve related files pass 123 cases, including
|
||||
real staged group actions, bribe answers, donor payments and rendered controls;
|
||||
a separate simultaneous-guide case passes. Typecheck, lint and the production
|
||||
@@ -30,8 +42,8 @@ build pass. [Scope](OPTIONAL_ALLIANCE_VICTORY.md#group-departures-and-unrelated-
|
||||
**Staged group Truthtrance and larger worm decisions — 29 October. Prototyped / Partial.**
|
||||
Alliance answers and expressions now read all group members rather than the
|
||||
single-partner field; the respondent's owned leave can satisfy a No. Bribe
|
||||
questions reject every current group ally. Group admissions with live bribes and
|
||||
changes with whole-turn commitments remain fenced. Larger worm response sequences have
|
||||
questions reject every current group ally. Changes with whole-turn commitments
|
||||
remain fenced. Larger worm response sequences have
|
||||
action-level tests with explicitly staged forces. Group lobby entry and complete
|
||||
interactions remain unfinished. Eighteen related files pass 185 cases,
|
||||
including the real-action group questions, rendered guides and staged worm
|
||||
@@ -45,7 +57,7 @@ cover four-member unanimous admission, three-donor funding, departure and
|
||||
rejoining, a three-stronghold win, Emperor aid, bot admission and actual table
|
||||
controls. Membership and selected faction helper cases cover up to six seats.
|
||||
Fourteen related files pass 120 cases, with an additional pair-target case;
|
||||
typecheck, lint and the production build pass. Live-bribe admissions and whole-turn commitments, other profiles,
|
||||
typecheck, lint and the production build pass. Whole-turn commitments, other profiles,
|
||||
full interactions and lobby entry remain unfinished.
|
||||
[Scope](OPTIONAL_ALLIANCE_VICTORY.md#unlimited-alliance-prototype--29-october-2026).
|
||||
|
||||
|
||||
Reference in new issue
Block a user