Open native advisor preparation before the first shipment
Allow Advanced BG preparation in phases2–5 at quiet boundaries, preserving original phase/auction/readiness and native eligibility. Close a current-turn receipt only on committed shipments, including marker and Sneak Attack entry. Retain the legacy phase5 queue and qualify the per-territory prevention policy. Connect persistent controls, minimal bot support and focused native evidence. Complete modes and browser/deployed acceptance remain open.
This commit is contained in:
1 parent
0e3d6a250e
commit
660b0a0c25
18 files changed
+1269
-13
No files matched your search
@@ -1,5 +1,20 @@
|
||||
# Rule decision index
|
||||
|
||||
## Native advisor preparation window — 24 October 2026
|
||||
|
||||
Apply supplied physical28 G and publisher base18 after-Spice/Nexus timing
|
||||
through the first actual shipment, rather than only phase5 initialization.
|
||||
A current-turn receipt closes at physical shipment commitment, including native
|
||||
transport, independent Ambassador shipping and positive Sneak Attack; proposals,
|
||||
stops and skipped
|
||||
allowances do not close it. A direct quiet-boundary preparation uses an original
|
||||
native owner/territory/turn Karama response without advancing the current phase.
|
||||
The 14 October selected retry policy denies only the prevented territory for
|
||||
this remaining window; Intrusion, Nexus and automatic flips remain separate.
|
||||
This retry scope is provisional. Preserve the already recorded supported Ecaz
|
||||
co-side composition rather than silently changing native eligibility.
|
||||
[Source, clock, continuation and limits](ADVISOR_PREPARATION.md#source-timing-and-scope--24-october-2026).
|
||||
|
||||
## Fremen allied revival response and later Recruits grant — 24 October 2026
|
||||
|
||||
Compose the base Fremen allied free rate with the general FAQ's cancelable
|
||||
|
||||
Reference in new issue
Block a user