Resume native Basic arrivals after Ornithopter recovery

Allow the completed flight discard in the existing bare Basic E3 profile.
Keep physical movement and its original arrival, then handle distinct
Ambassador or Terror fresh groups without replaying effects or Semuta cost.
This commit is contained in:
Quintine committed 2026-10-24 17:06:16 +11:00
1 parent 047011e243
commit 7b9938219d
12 files changed
+975 -8

No files matched your search

+30
View File
@@ -1,5 +1,35 @@
# Dune implementation status
## 24 October 2026 — Native Basic Ornithopter recovery and arrival
Admit the completed movement-card fresh group in the existing bare Basic E3
Semuta profile. Keep the actual moved group/counters and retire that event
before original movement-caused arrival. Clean CHOAM/Ix Ambassador and
Sabotage/Robbery overflow then retain distinct fresh groups, original payout,
one replacement/draw and native gift. The single physical Semuta cannot be
spent twice. Existing signatures and serialized fields remain unchanged;
overlap, native Advanced E3 and optional-profile guards remain.
Disjoint source/test lanes, actual control callbacks, bounded continuation
review and owner integration pass10 files135/135, types/lint/build and sixteen
gameplay/GameTable SSR programmes across both modes and both recovery points.
Eight existing-profile later-native continuations accept28 proposals without
strategy changes. Ambassador prefix56 plus1/2 real branch actions and Terror
70/71 actions retain actual setup, paid cache Orni, placements and shipments.
Semuta/overflow/full-hand acquisitions are explicitly conserved staging.
BG copy and empty CHOAM grants have separate source/control proof.
The pre-change range-three CHOAM case reproduces the missing first offer.
Source feedback corrects phase handling before traitor setup, the final native
Moritani setup window, legal next-turn1+1 dials and physical escrow inventory.
The first frozen rule union passes but type checking finds an offer/select
narrowing issue in a fixture; its source-qualified pass guard is repaired,
then final frozen proof passes.
[Exact source/evidence and remaining gates](SEMUTA_SOURCE_UPDATE_20260907.md#native-ornithopter-movement-and-arrival--24-october-2026).
No complete-mode/combination or browser/deployed certificate, full AI tuning,
comprehensive assurance or saved-room/D1/reset/restart/deployment operation.
## 24 October 2026 — Semuta before native Ghola income
A completed Ghola now offers its actual used card while the original Tleilaxu