Allow Advanced Auditor inspection choice
Verify and publish checkpoint container / container (push) Successful in 11m25s

This commit is contained in:
Quintine committed 2026-10-29 05:52:58 +11:00
1 parent 0681529e8e
commit 7e6e8c2d12
9 files changed
+292 -31

No files matched your search

+12
View File
@@ -2,6 +2,18 @@
7 September 2026 checkpoint, with an 8 October Advanced revival follow-up. Inspection, component identity and custody rules are connected. This does not certify the complete CHOAM faction or all expansion combinations; public Advanced and expansion starts remain gated.
## Advanced inspection choice — 29 October 2026
The user-authorized revised rules, physical p. 29, allow a surviving Auditor
to inspect **up to two** randomly selected unused opposing cards. This
implementation interprets that wording as a choice of one or two, bounded by
the current eligible hand; the killed Auditor remains limited to one. The
declared choice carries through Karama, cancellation and private sampling.
The opponent can cancel the entire inspection for one spice per card actually
viewable within that choice. Existing in-flight opportunities and old clients
without a count retain the previous maximum. This is a reading of the supplied
Advanced rules, not a publisher clarification or a change to Basic play.
## Semuta and current-hand eligibility — 11 October 2026
The explicit Semuta preview now preserves the original pending audit through
+9
View File
@@ -17,6 +17,15 @@ open mode gates.
## Current checkpoint and work
**Advanced CHOAM Auditor choice — 29 October. Prototyped / Partial.** A
surviving Auditor may select one or two eligible cards; the chosen count carries
through Karama, the actual cancellation price and the private random draw.
Old declarations and in-flight opportunities retain the maximum. Thirty-eight
related unit cases, a rendered control check, TypeScript, lint and the
production build pass; complete Advanced rules and deployed acceptance remain
open.
[Scope](CHOAM_AUDITOR.md#advanced-inspection-choice--29-october-2026).
**Gitea verification diagnostics — 29 October. Partial.** The approved
runner network configuration was already applied, and later runs reached the
application and published images. Run #85 failed in administrator acceptance
+8
View File
@@ -1,5 +1,13 @@
# Rule decision index
## Advanced Auditor inspection choice — 29 October 2026
The authorized revised rules, physical p. 29, say a surviving Auditor may
inspect up to two cards. The Advanced implementation interprets this as a
choice of one or two eligible random cards, with cancellation charged per
card actually viewable within the choice. This is not a publisher ruling and
does not alter Basic play. [Scope](CHOAM_AUDITOR.md#advanced-inspection-choice--29-october-2026).
## Truthtrance ally-funding updates — 29 October 2026
The first Basic current-phase ally-funding question counts a future accepted