Align Advanced Ix starting cards with Harkonnen pool
This commit is contained in:
1 parent
e530d267a3
commit
84fdd404c9
14 files changed
+637
-12
No files matched your search
@@ -1,5 +1,32 @@
|
||||
# Dune implementation status
|
||||
|
||||
## 27 October 2026 — Source-aligned Advanced Ixian starting draft
|
||||
|
||||
Prototyped / Partial. Fresh Advanced setup with Harkonnen now includes its extra starting card in the
|
||||
original Ixian pool; both Harkonnen cards come from the shuffled remainder.
|
||||
Basic retains its publisher-FAQ top-deck bonus. Already-opened Advanced
|
||||
old-count drafts keep their saved completion without a redeal. The persistent
|
||||
choice panel explains the actual procedure; Skills setup order is unchanged.
|
||||
|
||||
Frozen **15 affected files, 153/153**, types/lint/build and 6 genuine setup
|
||||
programmes pass: Basic/Advanced with Harkonnen, with/without all14 Skills,
|
||||
and two no-Hark controls. Runtime records 14 GameTable SSR renders,
|
||||
6 IxTechnology renders and 6 actual starting-card callbacks. Recorded
|
||||
arrays supply aggregate source/further action counts 28/16; preview
|
||||
initialization is outside those counts and is not public-start acceptance.
|
||||
Seventeen new pure/native cases include exact fourth-card selection, physical
|
||||
dealing, Skills order, old-count completion, rejected packets and four minimal
|
||||
legal policies. The conserved legacy supplement is labelled as a unit boundary,
|
||||
not a native historical-save journey. Related feedback updates the old pool
|
||||
expectation and advances an older Revival fixture through preceding real turns.
|
||||
|
||||
The existing server returned HTTP200 without restart. This checkpoint has local
|
||||
native/SSR/callback evidence; final rules, recovery, privacy, browser and deployed
|
||||
acceptance remain. No HTTP/storage boundary or saved-game/database operation.
|
||||
Proof: `/home/quintine/.local/share/dune/checkpoints/20261027-ix-starting-pool-proof-v2/`;
|
||||
journeys/HTML: adjacent `20261027-ix-starting-pool-runtime/run/`.
|
||||
[Source contract](IX_PROTOTYPE.md#advanced-starting-draft-source-cutover--27-october-2026).
|
||||
|
||||
## 27 October 2026 — Trained native E3 capture in Advanced
|
||||
|
||||
Prototyped / Partial. Fresh bare Advanced E3/all14 setups now connect Harkonnen with actual Ecaz
|
||||
|
||||
Reference in new issue
Block a user