Compose selected E3 independent cards with Nexus rules
Selected Ecaz/Moritani decks with independent cards and Nexus now retain native Occupy, Advanced assassination, arrival ordering and shared Duke consumers, including original optional modules. Keep the trained E3/Harkonnen capture boundary and remaining individual Nexus effect limits explicit. Validation: frozen 17-file 168/168, types/lint/build, seven finite original-action and table-SSR programmes, plus four minimal legal Cunning/expiry policies. Fixture corrections preserve the printed alliance draw gate and real paid placement affordability. No stored-game or production change; comprehensive and deployed acceptance remain open.
This commit is contained in:
1 parent
8422cf1f2d
commit
8793e23d6b
21 files changed
+1374
-24
No files matched your search
@@ -1,5 +1,22 @@
|
||||
# Dune implementation status
|
||||
|
||||
## 18 October 2026 — Selected E3 independent Nexus
|
||||
|
||||
Selected E3, optionally Ix/CHOAM/both, now composes independent cards/Nexus12
|
||||
and original all14/World/phase modules. Shared native consumers retain Occupy,
|
||||
Advanced Assassinate, Ambassador/Terror queue order, Duke Cunning and selected
|
||||
Ixian catalogues; no native-per-selected-family requirement or played-save
|
||||
conversion. Existing trained E3/Harkonnen capture boundary remains.
|
||||
|
||||
Three exclusive helper/fixture lanes and owner entry/arrival integration pass
|
||||
frozen17-file168/168, types/lint/build, seven finite original-action/table-SSR
|
||||
programmes and four legal Cunning/expiry policies. Fixtures corrected impossible
|
||||
two-seat draw and unwanted optional Ambassador spending; lint corrected a loop
|
||||
binding. No printed numerical rule changed. Bounded shared-profile review found
|
||||
no material defect. [Source-bound proof and remaining work](NEXUS_CARD_RULES.md#selected-e3-independent-nexus--18-october-2026).
|
||||
Ecaz Betrayal, Moritani Atomics and wider envelopes remain required; no saved
|
||||
room/reset/restart/deployment or complete-mode assurance claim.
|
||||
|
||||
## 18 October 2026 — Selected E1/E2 independent Nexus
|
||||
|
||||
Selected Ixian/CHOAM/combined38/50 composes independent cards and Nexus12 with
|
||||
|
||||
Reference in new issue
Block a user