Support earlier combined shipment and movement promises
This commit is contained in:
1 parent
d4e82c74b1
commit
8dbec05844
18 files changed
+1321
-46
No files matched your search
@@ -1,5 +1,49 @@
|
||||
# Dune implementation status
|
||||
|
||||
## 26 October 2026 — Earlier combined shipment and movement commitments
|
||||
|
||||
**Prototyped / Partial.**
|
||||
The combined travel question now uses the existing clean native phases0–5
|
||||
forecast in Basic/Advanced. Original current Charity/Revival/auction obligations
|
||||
share funding; required native bid/Revival actions precede pass or Ready.
|
||||
An old prior-turn shipped flag never counts as current progress or closes the
|
||||
future shipment. Every definite answer uniformly reopens only concurrent
|
||||
Charity/legacy Revival readiness, including constants; completed ordered
|
||||
Advanced Revival remains complete. Exact current-phase native packets include
|
||||
phase/event metadata, preserving owned cash/Karama invoices and paid Box search.
|
||||
Mandatory early progress can release impossibility; discretionary spending or
|
||||
completion cannot remove the last route. Private histories and four minimal
|
||||
profiles retain the original whole-answer/native-event meaning.
|
||||
|
||||
Root integration with disjoint controls/native lanes and bounded review passes
|
||||
**23 files,197/197**, types/lint/build and **three native paths**,25 GameTable SSR
|
||||
renders/three actual answer callbacks/16 guide callbacks. Original owned-Karama
|
||||
Revival-source Charity53 adds32 for native Ready, bid2, actual owned cash invoice,
|
||||
Revival and later paid ship2/ground2. Original Hajr Charity13 adds16 for frozen
|
||||
spice, real bribe3, paid shipment, ground move, physical Hajr and second move.
|
||||
Original earned post-Storm41 adds24: the real prior shipment flag remains true
|
||||
when answering, current progress starts empty, then the later ship/move fulfills.
|
||||
Original physical card inventories remain; no played source state is installed.
|
||||
|
||||
Nineteen native cases cover phases0–4, readiness, native auctions, current costs,
|
||||
prior-turn flags and four profiles; ten early control cases guard current source/
|
||||
phase/owner. Two genuine two-Truth bid cases retain funding and required bids in
|
||||
both orders. Three conserved controlled Revival cases reject double reservation
|
||||
and perform the required return before Ready, including four minimal profiles.
|
||||
V1 catches an allied-destination test assumption; the corrected Basin escrow
|
||||
case defers release to actual foreign income/cancellation. Native bid/Revival
|
||||
resource and guide repairs pass focused regressions. V2 passes all source checks;
|
||||
only its private smoke driver over-settles the invoice. Corrected runtime v3
|
||||
passes on the identical snapshot and explicitly reuses v2's unchanged checks.
|
||||
Proof/manifest:
|
||||
`/home/quintine/.local/share/dune/checkpoints/20261026-truth-travel-early-proof-v3/`;
|
||||
journeys/HTML: adjacent `20261026-truth-travel-early-runtime/`.
|
||||
No saved-game/database/server/reset/restart/deployment operation is performed.
|
||||
Other cross-action families, wider preparation/module compositions and final
|
||||
rules/browser/deployed/assurance remain. No complete mode is certified.
|
||||
[Authority, early forecast and source-bound evidence](TRUTHTRANCE_TRAVEL_PROMISES.md#earlier-native-phases--26-october-2026).
|
||||
|
||||
|
||||
## 26 October 2026 — Combined shipment and physical movement commitments
|
||||
|
||||
**Prototyped / Partial.**
|
||||
|
||||
Reference in new issue
Block a user