Bind completed Semuta exchanges to Truthtrance promises
This commit is contained in:
1 parent
4c4bebe85e
commit
b02839ce2a
24 files changed
+1014
-40
No files matched your search
@@ -1,5 +1,29 @@
|
||||
# Dune implementation status
|
||||
|
||||
## 27 October 2026 — Printed Semuta exchange commitments
|
||||
|
||||
Prototyped / Partial. Completed physical exchange/disposal counts after the
|
||||
answer; inspection alone does not. Current native events and the exact declared
|
||||
foreign Truth cost precede later shared-purse actions. Immediate No and surviving
|
||||
completion checks precede inspection, and actual result checks precede the typed
|
||||
suffix. Exact human guides and four minimal profiles preserve native controls.
|
||||
|
||||
Frozen **22 affected test files, 396/396**, types/lint/build and five
|
||||
runtime groups/six programmes pass. Five programmes use genuine earned cache
|
||||
Semuta and original Truth deals; one clearly labelled conserved-acquisition
|
||||
supplement generates its later multi-card batch through real battle controls.
|
||||
Runtime includes 30 GameTable SSR renders, 6 actual answer callbacks,
|
||||
8 whole-guide callbacks and 1 native Semuta callback.
|
||||
Source/further counts derive from actual arrays; inherited supplement history
|
||||
is explicitly unavailable. No new native acquisition is claimed for that setup.
|
||||
Tests also exercise genuine paid Box recovery/new-interval replay; a detached
|
||||
opaque quote supplement permits only generic Distrans fuel, not a specific
|
||||
unseen effect. Optional projection/fixture types, a const and a double-spent standing-bid
|
||||
test assumption are repaired after initial feedback; native reservations remain. No full AI, saved-game operation, restart or deployment occurs.
|
||||
Broader future calendars/combinations and all final acceptance remain open.
|
||||
[Contract](TRUTHTRANCE_TURN_ACTIONS.md#printed-semuta-exchange--27-october-2026).
|
||||
Private proof: `/home/quintine/.local/share/dune/checkpoints/20261027-truth-semuta-play-proof-v4/`.
|
||||
|
||||
## 27 October 2026 — Printed transfer/order commitments
|
||||
|
||||
Prototyped / Partial. Distrans and Sapho actual use share native costs/options
|
||||
|
||||
Reference in new issue
Block a user