Allow Distrans between completed auction bids
Verify and publish checkpoint container / container (push) Successful in 10m44s
Verify and publish checkpoint container / container (push) Successful in 10m44s
This commit is contained in:
1 parent
ab7a947833
commit
ccc4c7bb40
16 files changed
+250
-80
No files matched your search
@@ -1244,8 +1244,22 @@ added. Earlier stamps on captured or concealed discs do not prove present
|
||||
location. Homeworld, shared Duke, Kwisatz and exceptional custody remain
|
||||
separate; the later Basic interpretation is recorded above. [Source and scope](EFFECTIVE_BATTLE_WEAPONS.md#earlier-leaders-in-an-advanced-explosion--27-october-2026).
|
||||
|
||||
## Distrans between completed bidding actions — 29 October 2026
|
||||
|
||||
The printed card excludes play “during a bid” (publisher E2 p5), without
|
||||
clarifying the interval. Provisionally allow Distrans between completed bid,
|
||||
pass or sealed-submission actions on supported ordinary, Once Around, Silent
|
||||
and normal Black Market lots. Preserve the original lot, bidding commitments,
|
||||
funding, reserved recipient capacity and turn order; unresolved actions and
|
||||
other priority boundaries remain separately guarded. Started special lots
|
||||
remain blocked while the Semuta preview is enabled pending a supported discard
|
||||
continuation. This supersedes the
|
||||
first-action cutoffs in the 26 and 27 October entries below, and remains subject
|
||||
to official clarification. [Source and scope](RICHESE_DISTRANS_ENGINE_AUDIT.md#between-completed-bid-actions--29-october-2026).
|
||||
|
||||
## Distrans before Richese special bidding — 27 October 2026
|
||||
|
||||
Historical checkpoint: its first-action cutoff is superseded above.
|
||||
Provisionally extend the existing pre-bid interpretation to an untouched Once
|
||||
Around or Silent cache or Black Market lot, or normal Black Market lot. The first bid, pass or sealed
|
||||
submission closes the window. Preserve the physical lot, existing eligibility,
|
||||
@@ -2176,6 +2190,7 @@ future retention promise. [Source and controls](TRUTHTRANCE_CARD_COUNT.md#compou
|
||||
|
||||
## Distrans before the first ordinary bid/pass — 26 October 2026
|
||||
|
||||
Historical checkpoint: its first-action cutoff is superseded above.
|
||||
The printed card permits use except during a bid (publisher E2 p5). Under
|
||||
14 October choose-recommended authority, a physical ordinary lot with no bid,
|
||||
bidder, pass or committed contribution may accept Distrans before its first bid
|
||||
|
||||
Reference in new issue
Block a user