Connect Richese Nexus to ordinary auction purchases
This commit is contained in:
1 parent
724d9dce1e
commit
cf268243f3
19 files changed
+1241
-46
No files matched your search
@@ -2,6 +2,32 @@
|
||||
|
||||
Primary-source audit, 10 September 2026. This is a source and implementation-boundary contract, not a runtime completion claim. The coordinator has already asked about threshold restoration and splitting several revived Fedaykin; those answers remain pending.
|
||||
|
||||
## Selected storm and HMS route policy — 25 October 2026
|
||||
|
||||
Use the existing out-of-storm destinations and native HMS entry route, under
|
||||
the 14 October recommended-option authority. The supplied authorized revision,
|
||||
physical10/logical8 movement rule and physical32/logical30 Fremen B, separates
|
||||
ordinary storm restrictions from the named **shipment** exception. Southern
|
||||
**placement** does not inherit that exceptional shipment permission. This is
|
||||
selected provisional composition for Southern, not a new Southern FAQ.
|
||||
|
||||
Physical34/logical32 Ix B restricts non-Ix entry to reaching the pointing
|
||||
territory and then using Force Movement; HMS itself remains storm- and
|
||||
worm-protected. Southern placement grants no such route override. Tleilax's
|
||||
off-planet SEND likewise retains the Ixian direct-shipment restriction. Existing
|
||||
BG/Terror/Ambassador entry reactions do not grant a shipment or movement route.
|
||||
An occupied interior does not create a revival destination merely because it is
|
||||
sheltered. Display the route restriction first, even when the pointing sector
|
||||
is in storm; do not describe the HMS interior as exposed to that storm.
|
||||
|
||||
These choices replace the old waiting-for-ruling labels without opening an
|
||||
unsupported route, spending another allowance or changing the eligible group.
|
||||
They do not borrow the source-specific Moritani Cunning HMS exclusion as a
|
||||
universal user ban. Fresh source review used the supplied44-page PDF visually;
|
||||
E1/November publisher PDF retrieval returned403, so no fresh publisher
|
||||
confirmation is claimed. The earlier audit and checkpoints below remain dated
|
||||
evidence; their unresolved storm/HMS labels are superseded by this policy.
|
||||
|
||||
## Revival Terror continuation — 25 October 2026
|
||||
|
||||
**Prototyped / Partial.** The adopted physical SEND-entry interpretation now
|
||||
|
||||
Reference in new issue
Block a user