Prototype Emperor Nexus shortage handling
This commit is contained in:
1 parent
b620cea873
commit
e5c7e338e8
31 files changed
+1057
-95
No files matched your search
@@ -20,6 +20,28 @@ open mode gates.
|
||||
Keep identified Basic-function gaps ahead of Advanced and wider interactions.
|
||||
Prototype labels and final acceptance gates remain.
|
||||
|
||||
**Emperor Nexus positive shortages — 27 October. Prototyped / Partial.**
|
||||
Cunning uses five eligible ordinary counters when possible, otherwise the whole
|
||||
positive short battle group. Secret Ally revival takes three when eligible,
|
||||
otherwise all one or two typed-eligible Tanks counters. Zero and chosen underfill
|
||||
remain unavailable. Controls name the actual count and persistent provisional
|
||||
policy; no publisher shortage clarification was found. Full-grant receipt
|
||||
shapes/signatures remain unchanged, while new short sources are explicit.
|
||||
[Contract](NEXUS_EMPEROR_RULES.md#positive-shortages--27-october-2026).
|
||||
|
||||
**18 files, 130/130**, types/lint/build and five native runtime branches pass.
|
||||
Four original public Advanced base33/Nexus sources total 322 actions; 20 accepted
|
||||
continuations cover Cunning2/4 allowance, the original Cunning2 Karama-cancel
|
||||
branch and Secret Ally1/2 returns. Real first-turn losses, turn-two worms,
|
||||
alliances and closing draws earn the sources. Only unopened original card/Spice/
|
||||
Nexus positions and native scalar lotteries are selected; no played hand, purse,
|
||||
force, Tank, phase, alliance, holding or receipt is installed. Ten GameTable and
|
||||
ten controller SSR renders operate five actual controller callbacks. Stateful
|
||||
plans/selectors, browser hydration, new short own-World fees, other module pairs,
|
||||
full modes, mobile/deployed and final assurance are not certified. Older fixture
|
||||
phase/order and occupied-bank Collection expectations are repaired explicitly;
|
||||
their controlled positions are not new native chronology. No mode gate opens.
|
||||
|
||||
**Salusa Ghola / live Truthtrance — 27 October. Prototyped / Partial.**
|
||||
Before either full seal, feasible Yes, whole-No and grouped promises survive the
|
||||
actual return. A return that makes the actor's own promise impossible rejects
|
||||
|
||||
Reference in new issue
Block a user