6 Commits
Author SHA1 Message Date
Quintine 7d26929abd Count mobile stronghold passengers for spice collection 2026-10-28 01:03:06 +11:00
Quintine 4e55ab9e86 Allow selective mobile stronghold spice collection 2026-10-27 22:30:48 +11:00
Quintine 84fdd404c9 Align Advanced Ix starting cards with Harkonnen pool 2026-10-27 10:26:44 +11:00
Quintine 4ab20a2838 Preserve World occupation capabilities while Sandtrout waits 2026-10-26 12:18:06 +11:00
Quintine c95e294890 Document original Ix Spice card policies and readable effects
Retain the current first-turn worm precedence, later Thumper/Sandtrout equivalence and sequential physical Harvester doubling under explicit provisional preview interpretations. Record photographed component and publisher-source provenance, authorized Advanced corroboration, and unresolved wider timing boundaries. No new numerical rule or publisher clarification is claimed.

Warn persistently before first-turn Thumper disposal and explain waiting Sandtrout replacements. Public chronicle entries explain ignored first-turn Thumper and Sandtrout encounters. Correct stale preview gates in the relevant reference topics.

Genuine public Basic/Advanced selected-Ix programmes use original setup, unopened deal and Spice lotteries, real intervening turns and actual held physical cards. Separate assertions prove phase continuation, Nexus/doubling behavior, ready reset and retained physical stock; four existing minimal profiles legally accept a harvested window. Focused tests, types/lint/build and actual GameTable rendering are recorded in docs/IX_PROTOTYPE.md.

This remains bounded prototype evidence, not full native factions, optional combinations, browser/deployed or final assurance. No strategic AI refinement, state version, saved-room/database/reset/restart/deployment operation.
2026-10-24 12:32:13 +11:00
Quintine 5a76ae0410 Connect genuine Ix expansion setup to playable prototypes
Add an offline Ix initializer through the real setup pipeline, supporting Basic
and Advanced play, base factions, Ixians and Tleilaxu with the full 47-card deck
and 22-card spice deck. Preserve all normal start and publication gates.

Add a reusable local prototype starter: back up the named fresh ready lobby,
initialize it once by exact version/state comparison and preserve seat/recovery
tables and other rooms. Update the existing checklist with a separate prototype
stage and document functional scope, source interpretations and later refinement.

Six new tests cover all-profile private setup, exact typed starting forces,
Face Dancer/treachery custody, JSON continuation, two fixed-seed complete games
and local SQLite write/rejection boundaries. Independent review caught a missing
JSON version update, now fixed and covered; focused checking fixed one test typing
error before the stable broad check. No new rule interpretation was introduced.

Validation: types, lint and 4,211 offline tests passed (123.237s); production build
passed (6.543s); all 40 HTTP tests passed (23.578s). Source-bound report:
20260913-ix-prototype-final/report.json, fingerprint
3b8f295593bcb314bb72308d81739006b11d949d1e5906dbf6ce0704b15ebd72.

Browser W5LE6VFB: human Ixian + Medium Tleilaxu + Hard Atreides from genuine
setup, private starting-card refresh, Weather Control, mobile stronghold placement,
then owned Brutal autopilot. Atreides won on turn 1; this short complete journey
is not proof of every card or faction interaction. Finished private hand restored
at phone width; expanded Poison Tooth was readable. Fixed-seed offline games
2026091301 (Basic) and 2026091302 (Advanced) both completed with both Ix factions.

All 64 opening room versions/hashes are unchanged. One browser room and 30 HTTP
rooms were added, totaling 95. Reused the running server; no restart or automation.

Aggregate goal counters: 59,524,858 to 59,976,567 at completed verification,
451,709 tokens before final Git overhead. Two bounded workhorse helpers handled
inventory/tests and independent review; one stable full check/build/HTTP run.
Full game scope remains active and unfinished; future work prioritizes missing
functional prototypes before exhaustive refinement and final acceptance.
2026-09-13 12:17:33 +10:00