Commit Graph
2 Commits
Author SHA1 Message Date
Quintine 6e6fecc9d4 Prototype Leader Skills setup, battle disciplines and capture
Connect all fourteen physical skills and private setup to five card-role battle
modifiers, public posture, Harkonnen skilled capture, death return and optional
own-leader revival through controls, legal AI and persisted room actions.
Nine skill effects and combined-mode/publication acceptance remain unfinished.
Captured replacement entitlement and foreign ghola integration stay guarded.

Fresh publisher/designer research supports skilled-capture publicity through
its unique known physical card; this is recorded as a component inference.
Independent review found and fixed Voice/must-use-leader and invalid saved
assignment/offer cases. A pre-existing Discovery privacy assertion confused
card ID prefixes; the corrected deterministic physical-pair scenario was
independently reviewed. The first broad run was 4410/4411; corrected final
verification passes types/lint, all 4411 offline tests, build and 43 HTTP tests.
Final durations: check 149741ms, build 6659ms, integration 28274ms.
Source fingerprint: aef655ac1ebc0eb2f64294e13d3d27337167312cf8ab17568a166ee9c39f6a85.
Private final report: 20260913-leader-skills/checks-final/report.json.

Three seeded prototype games completed with no rejected bot candidates. Browser
setup/card inspection/refresh passed. Another user-reported power outage stopped
the server; backup and necessary restart restored the same private seat. All
292 games at restart and their original application records remain unchanged;
33 isolated HTTP-test rooms bring the current total to 325. No database reset.

Efficiency: one shared setup/lifecycle implementation supports five connected
role effects; selective existing agents handled catalog/UI/tests/research and
independent reviews. One repeated broad check was required by the reproduced
ID-prefix assertion failure. Aggregate goal counter rose from 65529766 to
67313673 through this checkpoint (1783907), including inherited context and
coordination; this is not a billing or savings estimate. Full goal remains active.
2026-09-13 17:31:37 +10:00
Quintine 369371671f Prototype Sapho first after completed movement turns
Allow a physical Sapho holder to go first among remaining unstarted combined
shipment/movement turns after earlier players have fully finished. Preserve
completed resources, cards, counters and physical order. Keep Advanced Guild
priority guarded until Guild leaves the remaining queue. Reuse private controls,
all four AI profiles and the existing action/CAS continuation.

Add four engine regressions and one independently authored SQLite recovery race;
upgrade the existing Sapho Advanced engine fixture to genuine Advanced setup.
Update player guidance and the rules decision register. Record the fourteen
Leader Skill cards and lifecycle as sourced future work, with unresolved edges.
No mode or publication gates are opened.

Validation: check (types, lint, 4,369 offline tests) and build passed. All 35 focused
Sapho tests passed; independent engine/persistence review found no blocker.
One initial focused Advanced test omitted the existing Guild shipment approval;
it was corrected to resolve that real decision before ending the turn.
No HTTP/auth/schema change; the HTTP suite was not repeated for this checkpoint.

Following the reported power outage, the existing localhost server was healthy,
SQLite integrity/foreign-key checks passed, and the saved QA seat restored the
same private hand, forces, resources and pending Storm decision after refresh.
All 291 opening room versions/state hashes and all application seat/recovery/
entry/handover records match the fresh backup. Cloudflare internal metadata
changed; application data did not. No restart or database reset was needed.

Source fingerprint: de0e0e52ef7b6888792a6e2ec5e8c4745da446ece843bf3092320e915d621266
Private report: /home/quintine/.local/share/dune/checkpoints/20260913-sapho-completed-boundary-checks/report.json
Private backup/comparison: /home/quintine/.local/share/dune/checkpoints/20260913-outage-sapho-before/
Check duration 146645 ms; build 6753 ms. Reported aggregate goal counter at this
milestone opening was 65037986 and before Git was 65524147 (486161 difference,
including outage recovery, parallel source research and coordination; not a
billing measurement or a savings claim).
2026-09-13 15:48:37 +10:00