From 47c38cb4eaea63c0ecf341bb3b7f5b8d7cfb44b7 Mon Sep 17 00:00:00 2001 From: raptorreplica Date: Wed, 14 Oct 2026 07:47:26 +1100 Subject: [PATCH] Record verified build status and unfinished HD work --- docs/resume-checkpoint.md | 58 +++++++++++++++++++++++++++++++++++++++ 1 file changed, 58 insertions(+) diff --git a/docs/resume-checkpoint.md b/docs/resume-checkpoint.md index 578935fe..2296e3d1 100644 --- a/docs/resume-checkpoint.md +++ b/docs/resume-checkpoint.md @@ -1,3 +1,61 @@ +# Current completion status — 14 October 2026 + +**The full project is not complete.** The playable, self-contained Rust build, +Linux and Windows executables, original data, mod packages and approved artwork +are tracked in this `RustRaptor` Git repository. The latest game/art release is +`3d14af205733c26a58084f4f27c3ef2bd4a7868d`, published on `codex/rust-rewrite` +at [Quintine/RustRaptor](https://github.com/Quintine/RustRaptor). + +The bundled pack actually contains **5,131 approved HD pictures / 3,310 complete +sequences**, including **4,045 terrain pictures**. Runtime metadata reports +9,139 data files. **622 original pictures still lack an approved bundled HD +remaster:** 490 terrain, 89 enemies/ground objects, 36 UI/other and seven boss +pictures. Existing drafts and private candidates are not counted as completed. + +The exact published release's [native Windows workflow](https://github.com/Quintine/RustRaptor/actions/runs/38309402730) +succeeded. Root independently confirmed the completed GitHub run and job, then +checked the retained actual job log: 341 tests passed, zero failed, 26 ignored; +5,131 HD frames validated with zero rejects; 45 mods and one override validated. +The packaged Unicode relocation and SDL gameplay checks passed. Captured mixed +audio and music-muted sound effects each contain nonzero PCM samples at 44.1kHz. +These are automated checks, not complete human playthrough or hardware/listening +approval. Root's saved confirmation is +`.reference/hd-root-next-publication-after5131/root-3d14af20-native-windows-confirmation.json`. + +The latest workers stopped with account usage-limit errors. Their saved results +survived; they are not continuing in the background. At the status check, Git +was clean, the remote branch matched `3d14af20`, and the following work remained: + +- **Next 97 terrain pictures:** source and different visual context reviews are + closed, including the final 40 combined contexts and repaired 10531/10535. + Actual six-picture private metadata is audited. The 29-picture private writer + completed once with 149 preserved files, but its independent final audit is + unfinished. The separate 62-picture metadata successor, independent review, + canonical registration, immutable handoff, runtime assembly, desktop review + and Git publication remain unfinished. The proposed total of 5,228 is not + the current game bundle. +- **Another 88 terrain candidates:** joint source plans and the zero-additional + prospective-97 impact are saved. Constructor preparation is unfinished; + independent code review, actual composition shards, visual reviews, metadata + and publication remain outstanding. Keep current and proposed foreign art + bindings distinct. Check free disk before producing the large review corpus. +- **Original ground object 40087:** the existing nearest-sampling option has + qualified intrinsic artwork and reviewed three-scene constructor code. + Root's exact compile/construction activation is saved, but the new actual-run + directory does not exist. Compilation, actual scene output, different visual + review and admission remain outstanding; no scene success is claimed. +- **Other original art:** held enemy, boss, interface and terrain repairs remain. + Latest 10536, 2054e, 2068f, 3007c and 30089 attempts retain explicit visual + holds. Distinct 1053e/3042e and another enemy repair preflights were interrupted. + Recover saved job/terminal histories before calling generation or writers. + +Root owns Git and runtime packaging; the coordinator owns external canonical +metadata and the four HD coverage documents. Preserve original/generated raw +assets and all existing review results. Resume existing workers from their +actual checkpoints, verify partially written preparations, and do not treat a +planned activation or draft as an executed or approved result. The older notes +below are historical; the counts and Windows result above take precedence. + # Restart checkpoint — 13 October 2026 The latest power outage interrupted the HD review workers, but their completed